While the innards of the Dining room, Kitchen and Staff room are being ripped apart and put back together, the construction on the New Lodge and Indoor Arena are chugging along. Closing down for the season along with the beautiful weather have helped the process along. This week, all the windows and doors in the “old” Lodge were pulled out and replaced while walls are being shifted and spaces reinvented. While that is happening, the drywall work was finished in the “new” Lodge and the siding is almost completely up. In addition, the stone work in the breezeway and on the fireplace is almost done as of today. The place is starting to look like a real Lodge. So, although the mud is thick and the sun is melting the snow rapidly, we’re tromping on with our mud boots and keeping our eye on the target so we can get it all done in time!